Company Locations Fields of Expertise Philosophy of Working
WTM ENGINEERS
Kontakt
Field of Expertise Hilfe  
The Schwinge Bridge is a section of the detour around the city of Stade.An opening of 15 m width has to be provided to ensure the accessibility to the ships on the river Schwinge.
1985 - 1988
Civil Egineering Structures Infrastructure
bridges, roads and highways, bewegliche bridges
study, project design, structural design, on-site construction inspection
6,500,000 EUR
The existing quay, built in 1985 for the container terminal at Rheinhafen Germersheim, which is operating at full capacity, was extended by 145 m.
1999 - 2001
Industrial and Commercial Buildings Infrastructure
trade centres, flood protection structures, warehouses, storage facilities for water pollutants
project management, project design, structural design, on-site construction inspection
5,000,000 EUR
In order to extend the HHLA Container Terminal Tollerort in the Port of Hamburg another 300 m of quay wall were built. In addition the “Europakai” was extended by 50 m and in connection with this land with an area of approximately 40.000 m² claimed.
1997 - 2000
Civil Egineering Structures Industrial and Commercial Buildings Infrastructure
trade centres, flood protection structures, warehouses, storage facilities for water pollutants
study, general construction planning, project management, project design, structural design, site management, on-site construction inspection
12,500,000 EUR
To secure the present status of Hamburg and especially that of the EurogateContainer Terminal as leading trans-shipment location the City of Hamburg built another 380 m of quay wall.
2003 - 2005
Infrastructure
trade centres, flood protection structures, storage facilities for water pollutants
project management, official approval of planning, project design, site management, on-site construction inspection
2,000,000 EUR
To secure the company location in Hamburg, Eurogate Container Terminal Hamburg GmbH intends to expand its storage capacities for containers. The site of the former tank area Dradenau has been chosen for the extension of the company grounds.
2003 - 2004
Infrastructure
trade centres
project management, project design, site management, on-site construction inspection
8,000,000 EUR
As a replacement for the dilapidated partially two-span bridge complex over the Mönkedammfleet, built between 1840 and 1910, a new singlespan road bridge is situated along the Alter Wall street.
2001 - 2003
Infrastructure
bridges, roads and highways
project design, structural design
2,500,000 EUR
A new Highway bridge is planned to substitute the removed railway crossing of Dassauweg in Hamburg. The construction site is situated in the natural conservation area.
2001 - 2003
Civil Egineering Structures Infrastructure
bridges, railway structures, roads and highways
project design, structural design
4,200,000 EUR
In order to make the new areas of the HafenCity accessible to fire protection and first aid services, there is a need for a new network of pathways at 7.5 m above sea level (SL). The Kibbelsteg bridges connect this network to the high tide protected areas of the inner city, crossing the Zollkanal, the Brooksfleet, and the “Am Sandtorkai“ street.
1999 - 2002
Civil Egineering Structures Infrastructure
bridges, roads and highways
study, general construction planning, project design, analysis of existing structures, structural design, on-site construction inspection, feasibility study
5,300,000 EUR
A new multi-storey covered car park with about 400 parking lots is planned to be constructed in the area of the existing P+R-complex situated in the northwest of Bergedorf’s S-Bahn train station. This plan anticipates a future addition of about 800 more parking lots.
2002 - 2005
Structural Design Infrastructure
terminals, parking facilities
project design, structural design, site management, on-site construction inspection, fire protection concept
4,000,000 EUR
The new footbridge at the Buchholz Train Station will serve as a connection between the two city areas, which are separated by the railway track. Furthermore, new staircases and elevators will provide access to the northern and southern platforms.
2003 - 2005
Civil Egineering Structures Infrastructure
bridges
project design, structural design, on-site construction inspection, Site supervision as accredited Check Engineer, supervision of health and safety protection
2,700,000 EUR
The construction of the “Klimahaus“ (Climate House) in the area between the old harbour of Bremerhaven and the river Weser will create a special tourist attraction for Bremerhaven.
2003 - 2007
Civil Egineering Structures Infrastructure
bridges, bewegliche bridges
general construction planning, project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection
4,500,000 EUR
Three different underground routes have been proposed to connect the “HafenCity“, Hamburg’s newly developing city district, to the underground public transportation network. WTM carried out the feasibility studies and cost estimation for each of the variants.
2001 - k.A.
Infrastructure
tunnles, railway structures
study, feasibility study
---