In order to utilize the hard-salt storage in the salt deposits of Bokeloh K+S AG developed their own method to produce the special fertiliser “Kieserit”. This method is based on an electro-static separation method. The plant has a capacity of 300.000 t/a.
1999 - 2001
Industrial and Commercial Buildings
industrial facilities, silo
structural design, site management, on-site construction inspection
7,000,000 EUR
The existing quay, built in 1985 for the container terminal at Rheinhafen Germersheim, which is operating at full capacity, was extended by 145 m.
1999 - 2001
Industrial and Commercial Buildings Infrastructure
trade centres, flood protection structures, warehouses, storage facilities for water pollutants
project management, project design, structural design, on-site construction inspection
5,000,000 EUR
In order to extend the HHLA Container Terminal Tollerort in the Port of Hamburg another 300 m of quay wall were built. In addition the “Europakai” was extended by 50 m and in connection with this land with an area of approximately 40.000 m² claimed.
1997 - 2000
Civil Egineering Structures Industrial and Commercial Buildings Infrastructure
trade centres, flood protection structures, warehouses, storage facilities for water pollutants
study, general construction planning, project management, project design, structural design, site management, on-site construction inspection
12,500,000 EUR
In connection with the modernization of the milling plant Ellmühle at Cologne-Deutz the existing unloader was extended to a total length of 14 m. Reason was lack of reach due to changed water-levels.
1999
Industrial and Commercial Buildings
industrial facilities, mill
demolition planning, project design, analysis of existing structures, structural design, site management
120,000 EUR
The existing milling plant (Rosenmühle) at Landshut was extended by a mill with the capacity of 180 t/d soft wheat.
2001 - 2002
Industrial and Commercial Buildings
industrial facilities, mill
project design, analysis of existing structures, structural design, site management, on-site construction inspection, supervision of health and safety protection, structural fire protection
1,500,000 EUR
The project includes an extruder- and a mixing-plant for grain as well as a machine tower and a warehouse.
1999 - 2002
Industrial and Commercial Buildings
industrial facilities, mill
project design, structural design, site management, on-site construction inspection, structural fire protection
1,700,000 EUR
Financed by KfW in cooperation with the Zimbabwean Government two silos were built and an existing one extended. The silo at Lions Den was up-graded in its equipment and increased in storage capacity (to 125.000 t).
1988 - 1990
Industrial and Commercial Buildings
silo
project design, structural design, on-site construction inspection
13,000,000 EUR
At the suburban fringe of Tashkent, Uzbekistan, a logistic centre is being planned, comprising a cotton warehouse of 20,000 m² to 30,000 m² and various other warehouses for coffee, tea and miscellaneous import goods as well as a container terminal.
2004 - offen
Structural Design Industrial and Commercial Buildings
warehouses
project design
30,000,000 EUR
The Logistik Terminal Waltershof, Hamburg, is planning to build a second warehouse for storage of sports and leisure fabrics. A part of the building will serve as a storage space of water pollutants.
2001 - 2003
Industrial and Commercial Buildings
warehouses
general construction planning, project design, site management, on-site construction inspection, fire protection concept
10,000,000 EUR
The milling company Mühlschlegel Besitz GbR in the industrial area of Weickelsdorf (Germany) implemented a milling plant with a capacity of 360 t/d. Size of the respective plot is 28.000 m².
2001 - 2003
Industrial and Commercial Buildings
office buildings, industrial facilities, silo, mill, warehouses
project design, structural design, planning of services, site management, on-site construction inspection, Site supervision as accredited Check Engineer, supervision of health and safety protection
keine Angabe vom clientn erlaubt
The Wesermühlen Hameln replaced their existing open-air discharging system by a new plant integrated in their main mill building. Discharging capacity for wheat-, rye- and maize-milling-products now is 150 t/h.
2001 - 2002
Industrial and Commercial Buildings
silo, mill
project design, site management, on-site construction inspection, supervision of health and safety protection
1,260,000 EUR